Ranchi: The water resources department has drafted the Jharkhand Flood Plain Zoning Act, 2026, to regulate development along riverbanks and minimise damage caused by floods.The draft legislation, aimed at promoting non-structural flood management, has been opened for stakeholder consultations until Nov 22. It will then be revised and placed before the state cabinet and assembly for approval.“Flood plain zoning aims to demarcate areas vulnerable to floods of varying magnitudes and frequencies, while specifying permissible developments to curb losses when rivers overflow,” said department’s engineer-in-chief Moti Lal Pingua.The draft proposes the creation of a State Flood Zoning Authority (SFZA), headed by the department secretary. The authority will prepare a state-level programme to prioritise rivers for hydraulic, topographical and environmental studies, publish draft zoning maps and maintain digital land records through a public GIS-based floodplain portal.It will also have the power to approve or reject activities in notified areas, incorporate flood zones into regional and disaster-management plans, and monitor compliance through field inspections, drones and satellite imagery.SFZA will be authorised to order the removal of unauthorised structures, promote early warning systems and evacuation plans, and recommend measures such as groundwater recharge, bank erosion control and the rehabilitation of vulnerable settlements.Based on SFZA surveys, flood plains will be classified into three risk categories.The protected zone will include the main river channel and areas liable to flooding during a one-in-five-year flood. Permanent construction, alteration of the natural river course, dumping of solid waste, landfills and large industrial or commercial projects will be prohibited in this zone, except essential infrastructure.
Do you support the drafting of the Jharkhand Flood Plain Zoning Act, 2026?
3k+ users shared opinion today
5k+ users already voted today
3k+ users shared opinion today
The regulatory zone will cover areas vulnerable to floods with return periods of five to 25 years. Residential settlements, critical defence installations and basement constructions will not be allowed there.The warning zone, covering areas affected by floods with return periods of 25 to 100 years, will prohibit nuclear plants and chemical industries generating hazardous waste.Based on SFZA recommendations, state govt may notify floodplain boundaries for any river, tributary, sub-tributary or specified river stretch, and regulate or prohibit land use in those areas.
